Connect to Content

Add layers or components to infinitely loop on your page.

Projects

William Beaumont Army Medical Center

This LEED-certified medical facility was among the largest healthcare construction projects in the U.S. at the time. S1F completed extensive moisture mitigation and concrete leveling before installing resilient finishes tailored for durability, infection control, and patient comfort across over a million square feet.

General Contractor:

Clark McCarthy Healthcare Partners II

Client :

U.S. Army Corps of Engineers

Location :

El Paso, Texas

Services :

Commerical Flooring & Levelling

Date :

June 2013

Budget :

$7,500,000

Project Description

The Fort Bliss Replacement Hospital is a state-of-the-art medical facility located in El Paso, Texas, designed to serve active-duty military personnel, their families, and veterans. Spanning over 1.1 million square feet, the hospital includes a 135-bed inpatient facility, outpatient clinics, an administrative building, clinical investigation and research facilities, and supporting infrastructure.

Built to replace the aging William Beaumont Army Medical Center, this LEED Silver-certified facility emphasizes advanced healthcare delivery, patient comfort, and operational efficiency. The design integrates modern medical technologies with enhanced sustainability and resilience standards to support military readiness and long-term community care.

Our scope of work included the installation of performance-driven flooring systems tailored to meet the rigorous demands of a medical environment—balancing durability, hygiene, and comfort across a wide variety of clinical and administrative spaces.Services Provided

Services Provided

  • Concrete Subfloor Leveling

  • Installation of Carpet Tile

  • Installation of Sheet Vinyl Flooring

  • Installation of Wall Base